Centrifuge Testing of Large Laterally Loaded Pile Groups in Sands
Authors:
- 1 October 1998
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Geotechnical and Geoenvironmental Engineering
- Vol. 124 (10) , 1016-1026
Abstract
An apparatus was developed to load large pile groups (3 × 3 to 7 × 3) founded in sand in the centrifuge laterally. The device consists of a hydraulic jack apparatus to install the piles, strain gauge instrumentation, and a data acquisition system. The instrumentation allowed the determination of both bending moments and shear forces at the head of each pile. Lateral load tests of 3 × 3 to 7 × pile groups were conducted in both loose and medium dense sands. Based on the test results, the pile group interaction effects were investigated. It was found that the p-y multiplier concept was valid. Also, the p-y multipliers (p specifically) are found to be independent of soil density and only a function of the pile group geometry. For this study (pile spacing was fixed at 3 diameters), they were found to be only a function of row position. Single pile tests were also completed for comparison purposes.Keywords
This publication has 6 references indexed in Scilit:
- The Florida Pier Analysis Program Methods and Models for Pier Analysis and DesignTransportation Research Record: Journal of the Transportation Research Board, 1997
- Centrifuge Testing of Fixed-Head Laterally Loaded Battered and Plumb Pile Groups in SandGeotechnical Testing Journal, 1996
- Lateral Response of Three-Row Groups in Loose to Dense Sands at 3D and 5D Pile SpacingJournal of Geotechnical Engineering, 1995
- Centrifuge Modeling of Laterally Loaded Pile Groups in SandsGeotechnical Testing Journal, 1994
- Lateral Load Behavior of Pile Group in SandJournal of Geotechnical Engineering, 1988
- Analysis of Laterally Loaded Piles in Sand1974