Parallel flowshop scheduling using Tabu search
Authors:
- 1 January 2003
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 41 (13) , 3059-3073
Abstract
Production scheduling problems in manufacturing systems with parallel machine flowshops are discussed. A mathematical programming model for combined part assignment and job scheduling is developed. The objective of solving the scheduling problem is to minimize a weighted sum of production cost and the cost incurred from late product delivery. The solution of the model is NP-hard. To solve the problem efficiently, a heuristic algorithm combining Tabu search and Johnson's method was proposed. Several numerical examples are presented to illustrate the developed model and the algorithm. Computational results from these example problems are very encouraging.Keywords
This publication has 17 references indexed in Scilit:
- Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobsComputers & Operations Research, 2002
- Defining tabu list size and aspiration criterion within tabu search methodsComputers & Operations Research, 2002
- Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up timesInternational Journal of Production Research, 2000
- Parallel Machine Scheduling, Linear Programming, and Parameter List Scheduling HeuristicsOperations Research, 1998
- Tabu Search1997
- Genetic Algorithms and Engineering Design1996
- General local search methodsEuropean Journal of Operational Research, 1996
- An improved branching scheme for the branch and bound procedure of schedulingnjobs onmparallel machines to minimize total weighted flowtimeInternational Journal of Production Research, 1988
- `` Strong '' NP-Completeness ResultsJournal of the ACM, 1978
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954