Stochastic Production Planning with Production Constraints
Authors:
- A. BensoussanABA. Bensoussan
- S. P. SethiSSS. P. Sethi
- R. VicksonRVR. Vickson
- N. DerzkoNDN. Derzko
- 1 November 1984
- journal article
- Published by Society for Industrial & Applied Mathematics (SIAM) in SIAM Journal on Control and Optimization
- Vol. 22 (6) , 920-935
Abstract
This paper considers an infinite horizon stochastic production planning problem with the constraint that production rate must be nonnegative. It is shown that an optimal feedback solution exists for the problem. Moreover, this solution is characterized and is then compared with the solution of the unconstrained problem. Also obtained, by using a policy iteration procedure, are computational solutions to the related problems with upper bounds on the production rate.Keywords
This publication has 3 references indexed in Scilit:
- Turnpike Horizons for Production PlanningManagement Science, 1980
- Deterministic and Stochastic Optimal Control1975
- Contraction Mappings in the Theory Underlying Dynamic ProgrammingSIAM Review, 1967