Lean Processes for Sustainable Project Delivery
- 1 October 2006
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 132 (10) , 1083-1091
Abstract
Facility owners and project teams often struggle to engage “green” or “sustainable” requirements on building projects and can incur additional project costs as a result. Although “investments” in high performance building features can be paid back through operational savings, the project delivery methods currently adopted by most teams are laden with process waste. Lean production principles have been proven to reduce waste and improve process performance in highly complex development and production environments. Adopting these lean principles, this paper reports a study that identified the presence of value and waste in a sustainable building project. Through an empirical investigation of the Real Estate and Facilities Division of Toyota Motor Sales, Toyota’s capital facility delivery process was mapped to identify both the steps in project delivery critical for success (value) and those that are waste. The investigation focused on the South Campus Facility, which received U.S. Green Building Council’s L...Keywords
This publication has 3 references indexed in Scilit:
- Delivering Green Buildings: Process Improvements for Sustainable ConstructionJournal of Green Building, 2006
- Quantifying Levels of Wasted Time in Construction with Meta-AnalysisJournal of Construction Engineering and Management, 2005
- Shielding Production: Essential Step in Production ControlJournal of Construction Engineering and Management, 1998