Lean-Agile FM-BIM: a demonstrated approach
- 8 November 2018
- journal article
- research article
- Published by Emerald Publishing in Facilities
- Vol. 36 (13/14) , 676-695
Abstract
Purpose: This paper aims to respond to the high cost of facility management-enabled building information model (FM-BIM) creation and maintenance, a significant and under-researched barrier to adoption for existing buildings. The resultant approach focuses on only value-adding content (“Lean”) developed flexibly and iteratively in collaboration with end-users (“Agile”).Design/methodology/approach: Five case studies were developed for university and hospital buildings in collaboration with end-users, guided by the process presented. These informed the refinement of a robust and flexible approach to increase BIM functionality with minimal geometry, focusing instead on the development of specific parameters to map semantic information necessary for each desired FM use.Findings: The resulting BIM provided a breadth of model functionality with minimal modeling effort: 15 hours average implementation time per supported FM use. This low level of effort was achieved by limiting geometry to where it is necessary for the FM use implementation. Instead, the model incorporated the majority of geometry by reference and focused on semantic and topological parameters to house FM information.Research limitations/implications: This study provides the basis for a new ontology structure focused on defining the rules for hosting asset management data (host entity, parameter type and characteristics) to reduce the reliance on complex geometric model development.Practical implications: By prioritizing highly beneficial applications, early investment is minimized, providing quick returns at low risk, demonstrating the value of FM-BIM to end-users.Originality/value: The Lean-Agile approach addresses the known research gap of low-effort, flexible approaches to FM-BIM model creation and maintenance and its effectiveness is analyzed through five case studies.Keywords
This publication has 28 references indexed in Scilit:
- A benefits realization management building information modeling framework for asset ownersAutomation in Construction, 2014
- BIM implementation throughout the UK construction project lifecycle: An analysisAutomation in Construction, 2013
- The project benefits of Building Information Modelling (BIM)International Journal of Project Management, 2013
- Multi-sprint planning and smooth replanning: An optimization modelJournal of Systems and Software, 2013
- Developing Mobile‐ and BIM‐Based Integrated Visual Facility Maintenance Management SystemThe Scientific World Journal, 2013
- Application Areas and Data Requirements for BIM-Enabled Facilities ManagementJournal of Construction Engineering and Management, 2012
- Building Information Modelling (BIM) for Facilities Management (FM)International Journal of 3-D Information Modeling, 2012
- Digital buildings – Challenges and opportunitiesAdvanced Engineering Informatics, 2011
- Interaction of Lean and Building Information Modeling in ConstructionJournal of Construction Engineering and Management, 2010
- Lean project managementBuilding Research & Information, 2003