ON SIMULATION IN PLANNING NETWORKS
Authors:
- 1 August 1992
- journal article
- research article
- Published by Taylor & Francis in Civil Engineering Systems
- Vol. 9 (1) , 59-68
Abstract
Construction activities generally have a non-negligible amount of variability associated with them. This has lead to the consideration of techniques such as PERT, PNET and Monte Carlo simulation in the planning of construction projects. This paper firstly proposes a modification to the PNET procedures and then goes on to examine Monte Carlo simulation in an integrated cost-time formulation under three options relating to the latest finish date of the project final activity. Two of the options lead to the possibility of negative float while the criticality index for the activities is different for all options. The approach is demonstrated on a three-span bridge construction project. A variance reduction technique is used to reduce the number of computations.Keywords
This publication has 3 references indexed in Scilit:
- ‘Intelligent’ construction time and cost analysisConstruction Management and Economics, 1986
- Probabilistic Time SchedulingJournal of the Construction Division, 1976
- Letter to the Editor—Monte Carlo Methods and the PERT ProblemOperations Research, 1963