Short-term planning of a work shift for open-pit mines: A case study
Open Access
- 5 March 2023
- journal article
- research article
- Published by Taylor & Francis in Cogent Engineering
- Vol. 10 (1)
Abstract
This work deals with the short-term planning problem of a work shift for open-pit mines. The problem involves ore and waste fronts, shovels, heterogeneous truck fleets, and discharge points. The allocation of trucks is dynamic to allow multiple routes to be assigned to each truck. The problem consists of deciding which fronts must be mined and establishing the number of trucks, their routes, and the amount of material transported by them to each discharge point, satisfying a stripping ratio at the desired level. The objectives are to minimize the deviations from the targets for production, chemical grade, and particle size range of each control parameter at each plant and reduce the number of trucks needed for the process. To solve the problem, we developed a mixed-integer linear goal programming model and tested it using real data from an iron ore mine. The results showed that the proposed approach supports decision-makers in the sizing and allocation of truck fleets and in meeting the production and control parameter targets required by the ore processing plants according to the daily scenario, such as low availability of shovels and trucks, flexibility in ore quality, and need for increased production.Keywords
Funding Information
- Conselho Nacional de Desenvolvimento Científico e Tecnológico (303266/2019-8)
- Fundação de Amaparo à Pesquisa de Minas Gerais (00676-17)
- Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (001)
This publication has 29 references indexed in Scilit:
- Energy efficient scheduling of open-pit coal mine trucksEuropean Journal of Operational Research, 2017
- A Decomposition-Based Algorithm for the Scheduling of Open-Pit Networks Over Multiple Time PeriodsManagement Science, 2016
- Short-term scheduling of an open-pit mine with multiple objectivesEngineering Optimization, 2016
- A new open-pit multi-stage mine production timetabling model for drilling, blasting and excavating operationsMining Technology: Transactions of the Institutions of Mining and Metallurgy, 2016
- An Integer Programming Approach for Truck-Shovel Dispatching Problem in Open-Pit MinesEnergy Procedia, 2015
- A mixed integer linear programming model for short-term open pit mine production schedulingMining Technology: Transactions of the Institutions of Mining and Metallurgy, 2012
- A hybrid heuristic algorithm for the open-pit-mining operational planning problemEuropean Journal of Operational Research, 2010
- Overview of Solution Strategies Used in Truck Dispatching Systems for Open Pit MinesInternational Journal of Surface Mining, Reclamation and Environment, 2002
- Sequential data assimilation with a nonlinear quasi‐geostrophic model using Monte Carlo methods to forecast error statisticsJournal of Geophysical Research: Oceans, 1994
- Cost Horizons and Certainty Equivalents: An Approach to Stochastic Programming of Heating OilManagement Science, 1958