A Heuristic Method for a Flexible Flow Line with Unrelated Parallel Machines Problem
- 1 December 2006
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 21582181,p. 1-4
Abstract
The problem considered in this paper is a flexible flow line with multiple serial stages, where there are one or more unrelated parallel machines at each stage and there exists a bottleneck stage in the system. The objective of the scheduling problem is to minimize the total flow time of jobs. A heuristic method is proposed to solve the scheduling problem. It focuses on the bottleneck stage and a heuristic procedure is developed as part of the method to construct the schedule for the bottleneck stage. This is because the bottleneck stage may not be the first; the arrival time of jobs at the bottleneck stage may not be zero. A trial simulation is adopted to schedule the jobs at the stages ahead of the bottleneck stage so as to obtain the arrival time of jobs at the bottleneck stage. To evaluate the performance of the suggested method, the shortest processing time (SPT) dispatching rule is investigated for comparison purposes and computational experiments are performed on randomly generated test problems. Results show that the suggested method performs better than the SPT dispatching rule for various test problemsKeywords
This publication has 7 references indexed in Scilit:
- Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machinesComputers & Operations Research, 2005
- Bottleneck-focused scheduling for a hybrid flowshopInternational Journal of Production Research, 2004
- A flexible flowshop problem with total flow time minimizationEuropean Journal of Operational Research, 2001
- Hybrid flow shop scheduling: A surveyComputers & Industrial Engineering, 1999
- Comparison of Scheduling Rules in a Flow Shop with Multiple Processors: A SimulationSIMULATION, 1998
- A comparison of sequencing rules in static and dynamic hybrid flow systemsInternational Journal of Production Research, 1997
- The Complexity of Flowshop and Jobshop SchedulingMathematics of Operations Research, 1976