A runtime resolution scheme for priority boost conflict in implicit coscheduling
- 9 March 2007
- journal article
- research article
- Published by Springer Nature in The Journal of Supercomputing
- Vol. 40 (1) , 1-28
Abstract
No abstract availableKeywords
This publication has 24 references indexed in Scilit:
- Adaptive parallel job scheduling with flexible coschedulingIEEE Transactions on Parallel and Distributed Systems, 2005
- Metric and workload effects on computer systems evaluationComputer, 2003
- Co-ordinated coscheduling in time-sharing clusters through a generic framework2003
- User-level communication in a system with gang scheduling2002
- A comparative evaluation of implicit coscheduling strategies for networks of workstations2002
- IMPROVED RESOURCE UTILIZATION WITH BUFFERED COSCHEDULINGParallel Algorithms and Applications, 2001
- The Virtual Interface ArchitectureIEEE Micro, 1998
- Effective distributed scheduling of parallel workloads1996
- Myrinet: a gigabit-per-second local area networkIEEE Micro, 1995
- A case for NOW (Networks of Workstations)IEEE Micro, 1995