Mining Method Selection and Optimization for Hanging-Wall Ore-Body at Yanqianshan Iron Mine, China
Authors:
- 17 October 2016
- journal article
- research article
- Published by Springer Nature in Geotechnical and Geological Engineering
- Vol. 35 (1) , 225-241
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (51525402, 51374049, 51534003)
This publication has 9 references indexed in Scilit:
- Numerical simulation of pre-mining stress field in a heterogeneous rockmassInternational Journal of Rock Mechanics and Mining Sciences, 2014
- Rational design of ore discharge bottom in transition from open pit to underground mining in udachny mineJournal of Mining Science, 2013
- Transition from open-pit to underground as a new optimization challenge in mining engineeringJournal of Mining Science, 2009
- Stability analysis of subgrade cave roofs in karst regionJournal of Central South University of Technology, 2008
- Catastrophic model for stability analysis of high pile-column bridge pierJournal of Central South University of Technology, 2007
- FLAC/PFC coupled numerical simulation of AE in large-scale underground excavationsInternational Journal of Rock Mechanics and Mining Sciences, 2007
- Numerical evaluation of the effects of stress and excavation surface geometry on the zone of relaxation around open stope hanging wallsInternational Journal of Rock Mechanics and Mining Sciences, 2007
- Stability and reliability of pit slopes in surface mining combined with underground mining in Tonglushan mineJournal of Central South University of Technology, 2004
- Geotechnical applications in open pit miningGeotechnical and Geological Engineering, 2001