Product Family Manufacturing Plan Generation and Classification
Authors:
- 1 March 2000
- journal article
- other
- Published by SAGE Publications in Concurrent Engineering
- Vol. 8 (1) , 12-23
Abstract
In the concurrent engineering approach, the problems related to product fabrication are taken into account as early as possi ble in design process. Manufacturing and assembly process design are decisive and expensive processes conditioning all the future steps of industrialisation and fabrication. In this paper a new method for assembly plan generation, based on the concept of meta-prod uct, is presented. This method is designed for modern production environments that are organised in product families with multiple op tions and variants. Facing the combinatory explosion problem, the method proposes an original representation of assembly sequences allowing the generation of a minimal list of non-redundant assembly plans called meta-sequences. In this method, an optimal assembly sequence class is selected. Then, for each product variant an optimal specific plan class is deduced from a simple analysis of product variant's components. An assembly reactive control system, adapting this optimal solution to the real assembly workshop conditions is also proposed. Another competitive problem is the case of production of old or short-series products. To rationalise their manufacturing, a solution consists in classifying products into classes, on the basis of similarity of required manufacturing processes. This technique called group technology (GT) helps to minimize unnecessary variety of products in a manufacturing plant by making designers aware of existing simi lar components. In this paper a new GT method is presented. It allows the classification of sequential manufacturing sequences as well as tree-like manufacturing plans. The method is based on an adapted representation of tree-like manufacturing plans, the distance adapted to this special case, efficient heuristics, and hierarchical bottom-up classification. Then, each product class can be managed in accordance to our family product generation method, or can be served as a base for reengineering process of firm's range of products.Keywords
This publication has 11 references indexed in Scilit:
- On constraints in assembly planningIEEE Transactions on Robotics and Automation, 1998
- A structure-oriented approach to assembly sequence planningIEEE Transactions on Robotics and Automation, 1997
- Change to group technology: process organization is obsoleteInternational Journal of Production Research, 1992
- Bond Energy, Rectilinear Distance and a Worst-case Bound for the Group Technology ProblemJournal of the Operational Research Society, 1991
- A correct and complete algorithm for the generation of mechanical assembly sequencesIEEE Transactions on Robotics and Automation, 1991
- An integrated computer aid for generating and evaluating assembly sequences for mechanical productsIEEE Transactions on Robotics and Automation, 1991
- Simplified generation of all mechanical assembly sequencesIEEE Journal on Robotics and Automation, 1987
- A Tree-to-Tree Distance and Its Application to Cluster AnalysisIEEE Transactions on Pattern Analysis and Machine Intelligence, 1979
- The tree-to-tree editing problemInformation Processing Letters, 1977
- The String-to-String Correction ProblemJournal of the ACM, 1974