Seven-Year Field Monitoring of Four Integral Abutment Bridges
- 1 February 2012
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Performance of Constructed Facilities
- Vol. 26 (1) , 54-64
Abstract
Integral abutment bridges (IABs) are now a routine construction and design of choice for many DOTs as bridges are replaced or for new roadways. However, current design and analysis methodologies have not matured substantially because of a lack of available long-term field data. Often current analysis methods predict bridge behavior that is much different from observed. Because of thermal loading, time-dependent effects, and soil-structure interaction, significant irreversible abutment displacements and rotations occur. The primary objective of this paper is to report the actual in situ measurements obtained at four short to medium-long IABs and one weather station, all located in central Pennsylvania. A total of 240 instruments was installed on four IABs during bridge construction and monitored continuously. Monitoring duration at each bridge ranges from 2.5 years to nearly 7 years, having initiated the program in 2002 and continuing to the present. Because of a unique environmental issue, the bridges wer...Keywords
This publication has 9 references indexed in Scilit:
- Numerical analysis method for long-term behavior of integral abutment bridgesEngineering Structures, 2010
- Integral abutment bridge response under thermal loadingEngineering Structures, 2010
- Long-Term Response Prediction of Integral Abutment BridgesJournal of Bridge Engineering, 2009
- Integral Abutment Bridge Behavior: Parametric Analysis of a Massachusetts BridgeJournal of Bridge Engineering, 2007
- Predicted and Measured Response of an Integral Abutment BridgeJournal of Bridge Engineering, 2005
- Time-Dependent Behavior of a Concrete Integral Abutment BridgeTransportation Research Record: Journal of the Transportation Research Board, 2005
- Thermally Induced Superstructure Stresses in Prestressed Girder Integral Abutment BridgesTransportation Research Record: Journal of the Transportation Research Board, 2005
- Influence of Daily and Annual Thermal Variations on Integral Abutment Bridge Performance2004
- Validation of Design Recommendations for Integral‐Abutment PilesJournal of Structural Engineering, 1991