Towards circular economy in production planning: Challenges and opportunities
Authors:
- Elodie SuzanneESElodie Suzanne
- Nabil AbsiNANabil Absi
- Valeria BorodinVBValeria Borodin
- 1 November 2020
- journal article
- research article
- Published by Elsevier in European Journal of Operational Research
- Vol. 287 (1) , 168-190
Abstract
No abstract availableKeywords
Funding Information
- European Commission
- Horizon 2020
This publication has 153 references indexed in Scilit:
- A Lagrangian relaxation based approach for the capacitated lot sizing problem in closed-loop supply chainInternational Journal of Production Economics, 2012
- The Pollution-Routing ProblemTransportation Research Part B: Methodological, 2011
- A new Silver–Meal based heuristic for the single-item dynamic lot sizing problem with returns and remanufacturingInternational Journal of Production Research, 2011
- On the optimal design of the disassembly and recovery processesWaste Management, 2009
- Inventory policies for the economic lot-sizing problem with remanufacturing and final disposal optionsJournal of Industrial and Management Optimization, 2009
- Combinatorial optimization and Green Logistics4OR, 2007
- Dynamic lot sizing with product returns and remanufacturingInternational Journal of Production Research, 2006
- A two-stage heuristic for disassembly scheduling with assembly product structureJournal of the Operational Research Society, 2004
- Disassembly sequencing: A surveyInternational Journal of Production Research, 2003
- Disassembly of multiple product structuresComputers & Industrial Engineering, 1997