Minimizing the makespan in a two-machine cross-docking flow shop problem
Authors:
- Feng ChenFCFeng Chen
- Chung-Yee LeeCLChung-Yee Lee
- 1 February 2009
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 193 (1) , 59-72
Abstract
No abstract availableThis publication has 13 references indexed in Scilit:
- The Best Shape for a CrossdockTransportation Science, 2004
- Flow Shop Scheduling Problems Under Machine–Dependent Precedence ConstraintsJournal of Combinatorial Optimization, 2004
- Reducing Labor Costs in an LTL Crossdocking TerminalOperations Research, 2000
- The Effects of Trailer Scheduling on the Layout of Freight TerminalsTransportation Science, 1999
- Machine scheduling with an availability constraintJournal of Global Optimization, 1996
- An optimal solution to a dock door assignment problemComputers & Industrial Engineering, 1992
- A microcomputer based decision support tool for assigning dock doors in freight yardsComputers & Industrial Engineering, 1990
- Sequencing to Minimize the Maximum Job CostOperations Research, 1980
- Sequencing with Series-Parallel Precedence ConstraintsMathematics of Operations Research, 1979
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954