Capital Budgeting Decisions With Fuzzy Projects
Authors:
- 1 January 1998
- journal article
- research article
- Published by Taylor & Francis in The Engineering Economist
- Vol. 43 (2) , 125-150
Abstract
In this paper, we propose a capital budgeting model under uncertainty in which cash flow information is specified as a special type of fuzzy number—triangular fuzzy numbers. We then estimate the present worth of each fuzzy project cash flow. Using the present worth criterion, we propose a new project dominance method to determine the preference of fuzzy projects. To select fuzzy projects under limited capital budget, a branch and bound procedure is suggested. To illustrate the procedure, we give a numerical example and compare and analyze the results of the capital rationing problem using the proposed dominance method and two other conventional dominance methods.Keywords
This publication has 15 references indexed in Scilit:
- A Case Study Comparison of the Analytic Hierarchy Process and a Fuzzy Decision MethodologyThe Engineering Economist, 1995
- FUZZY CASH FLOW ANALYSIS USING PRESENT WORTH CRITERIONThe Engineering Economist, 1994
- Solving fuzzy equations in economics and financeFuzzy Sets and Systems, 1992
- A fuzzy multi-criteria decision-making method for facility site selectionInternational Journal of Production Research, 1991
- The fuzzy mathematics of financeFuzzy Sets and Systems, 1987
- Analysis of Water Use and Needs in Agriculture Through a Fuzzy Programming Model1987
- A review of some methods for ranking fuzzy subsetsFuzzy Sets and Systems, 1985
- Systems of linear fuzzy constraintsFuzzy Sets and Systems, 1980
- Integer Programming Algorithms: A Framework and State-of-the-Art SurveyManagement Science, 1972
- An Additive Algorithm for Solving Linear Programs with Zero-One VariablesOperations Research, 1965