Feasibility of a bilateral market for load following
Authors:
- A. BoseABA. Bose
- K. TomsovicKTK. Tomsovic
- 1 January 2001
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 16 (4) , 782-787
Abstract
In the ongoing process to create a competitive electricity market, the problem of ancillary services is assuming a fundamental role. Ancillary services are those services performed by generators, transmission and control equipment, which are necessary to support basic services and to maintain reliable operations and system security. In this paper, we focus our attention on one of these services, load following, and propose a competitive way to provide this service through bilateral contracts between supplier and customer. In general, we assume that there will be both a competitive market for the provision of load following and an authority responsible for the amount of load following not met by bilateral contracts.Keywords
This publication has 9 references indexed in Scilit:
- NERC's new control performance standardsIEEE Transactions on Power Systems, 1999
- Competitive procurement of ancillary services by an independent system operatorIEEE Transactions on Power Systems, 1999
- Power exchange for frequency control (PXFC)1999
- Automatic generation control in a deregulated power systemIEEE Transactions on Power Systems, 1998
- Creating competitive markets for ancillary services1997
- AGC simulator for price-based operation. I. A modelIEEE Transactions on Power Systems, 1997
- Load frequency control issues in power system operations after deregulationIEEE Transactions on Power Systems, 1996
- Transformed automatic generation controlIEEE Transactions on Power Systems, 1996
- Understanding automatic generation controlIEEE Transactions on Power Systems, 1992