Abstract
This article considers two scheduling problems on parallel identical machines with deteriorating jobs, in which the processing time of job is proportional function of its starting times to be processed. Namely, for job j, p j = b j t, where b j > 0 is its deterioration rate, t ≥ t 0 > 0 is its starting time and t 0 is a given constant. The criteria of optimality are minimising the makespan and maximising the minimum machine completion time. It has been proved that the first problem is NP-hard; we prove that the second problem is also NP-hard. For both problems heuristic algorithms are constructed and their performance is analysed.

This publication has 14 references indexed in Scilit: