Planning high quality metering systems for state estimation through a constructive heuristic
Authors:
- Helder Roberto de Oliveira RochaHRHelder Roberto de Oliveira Rocha
- Julio Cesar Stacchini de SouzaJSJulio Cesar Stacchini de Souza
- Milton Brown Do Coutto FilhoMFMilton Brown Do Coutto Filho
- 1 November 2013
- journal article
- Published by Elsevier in International Journal of Electrical Power & Energy Systems
- Vol. 52, 34-41
Abstract
No abstract availableKeywords
Funding Information
- Conselho Nacional de Desenvolvimento CientÃfico e Tecnológico
- Fundação Carlos Chagas Filho de Amparo à Pesquisa do Estado do Rio de Janeiro
This publication has 19 references indexed in Scilit:
- Handling Critical Data and ObservabilityElectric Power Components and Systems, 2007
- Optimal Metering Systems for Monitoring Power Networks Under Multiple Topological ScenariosIEEE Transactions on Power Systems, 2005
- A PC based state estimator interfaced with a remote terminal unit placement algorithmIEEE Transactions on Power Systems, 2001
- A unified approach to robust meter placement against loss of measurements and branch outagesIEEE Transactions on Power Systems, 2000
- Optimal meter placement for maintaining observability during single branch outagesIEEE Transactions on Power Systems, 1999
- A meter placement method for state estimationIEEE Transactions on Power Systems, 1995
- A tool for the evaluation and selection of state estimator measurement schemesIEEE Transactions on Power Systems, 1994
- Network Observability: Identification of Observable Islands and Measurement PlacementIEEE Transactions on Power Apparatus and Systems, 1985
- Power System State Estimation with Measurement Deficiency: an Observability/Measurement Placement AlgorithmIEEE Transactions on Power Apparatus and Systems, 1983
- State Estimator Measurement System Reliability Evaluation -- An Efficient Algorithm Based on Topological Observability TheoryIEEE Transactions on Power Apparatus and Systems, 1982