Divergent production scheduling with multi-process routes and common inventory
Authors:
- 15 October 2012
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 50 (20) , 5762-5782
Abstract
This research considers a scheduling problem in a divergent production system (DPS) where a single input item is converted into multiple output items. Therefore, the number of finished products is much larger than the number of input items. This paper addresses two important challenges in a real-life DPS problem faced by an aluminium manufacturing company. One challenge is that one product can be produced following different process routes that may have slightly different capabilities and capacities. The other is that the total inventory capacity is very limited in the company in the sense that a fixed number of inventory spaces are commonly shared by raw materials, WIP (work-in-process) items and finished products. This paper proposes a two-step approach to solving this problem. In the first step, an integer programming (IP) model is developed to plan the type and quantity of operations. In the second step, a particle swarm optimisation (PSO) is proposed to schedule the operations determined in the first step. The computational results based on actual production data have shown that the proposed two-step solution is appropriate and advantageous for the DPS scheduling problem in the company.Keywords
This publication has 22 references indexed in Scilit:
- Aggregate procurement, production, and shipment planning decision problem for a three-echelon supply chain using swarm-based heuristicsInternational Journal of Production Research, 2011
- A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasksInternational Journal of Production Research, 2008
- An interactive particle swarm optimisation for selecting a product family and designing its supply chainInternational Journal of Computer Applications in Technology, 2008
- Interweaving genetic programming and genetic algorithm for structural and parametric optimization in adaptive platform product customizationRobotics and Computer-Integrated Manufacturing, 2007
- Particle swarm optimization and differential evolution for the single machine total weighted tardiness problemInternational Journal of Production Research, 2006
- Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup timesInternational Journal of Production Research, 2006
- A Cooperative Approach to Particle Swarm OptimizationIEEE Transactions on Evolutionary Computation, 2004
- Multicriterion Evolutionary Structural Optimization Using the Weighting and the Global Criterion MethodsAIAA Journal, 2001
- Benchmarks for shop scheduling problemsEuropean Journal of Operational Research, 1998
- A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteriaInternational Journal of Production Research, 1994