Lot cycle time prediction in a ramping-up semiconductor manufacturing factory with a SOM–FBPN-ensemble approach with multiple buckets and partial normalization
Authors:
- 1 August 2008
- journal article
- research article
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 42 (11-12) , 1206-1216
Abstract
No abstract availableKeywords
This publication has 16 references indexed in Scilit:
- A fuzzy-neural approach for estimating the monthly output of a semiconductor manufacturing factoryThe International Journal of Advanced Manufacturing Technology, 2007
- A hybrid look-ahead SOM-FBPN and FIR system for wafer-lot-output time prediction and achievability evaluationThe International Journal of Advanced Manufacturing Technology, 2006
- A Hybrid SOM-BPN Approach to Lot Output Time Prediction in a Wafer FabNeural Processing Letters, 2006
- A Look-Ahead Fuzzy Back Propagation Network for Lot Output Time Series Prediction in a Wafer FabLecture Notes in Computer Science, 2006
- Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factoryApplied Soft Computing, 2006
- Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factoryJournal of Intelligent Manufacturing, 2005
- A daily production model for wafer fabricationThe International Journal of Advanced Manufacturing Technology, 2004
- A fuzzy back propagation network for output time prediction in a wafer fabApplied Soft Computing, 2003
- A Case-Based Reasoning Approach for Due-Date Assignment in a Wafer Fabrication Factory2001
- The impact of priority rule combinations on lateness and tardinessIIE Transactions, 1998