Abstract
This paper explains the technical constraints faced by embedded generation (EG) projects and a methodology using linear programming to determine the optimal allocation of EG with respect to the constraints. Optimal allocation ensures best use of the existing assets and achieves a higher penetration of EG in a cost effective manner. Results are presented highlighting the problem of network sterilisation and demonstrating that the proper placement and sizing of EG is crucial to the accommodation of increasing levels of EG on distribution networks. As a result of the restructuring of electricity markets and the targets laid down for renewable energy, increasing amounts of EG are being connected to distribution networks. (5 pages)