Abstract
In this paper an approach to planning of additional resources when scheduling operations are discussed. The considered resources are assumed to be discrete and renewable. In most research in scheduling domain, the basic and often the only type of regarded resources is a workstation. It can be understood as a machine, a device or even as a separated space on the shop floor. In many cases, during the detailed scheduling of operations the need of using more than one resource, required for its implementation, can be indicated. Resource requirements for an operation may relate to different resources or resources of the same type. Additional resources are most often referred to these human resources, tools or equipment, for which the limited availability in the manufacturing system may have an influence on the execution dates of some operations. In the paper the concept of the division into basic and additional resources and their planning method was shown. A situation in which sets of basic and additional resources are not separable - the same additional resource may be a basic resource for another operation is also considered. Scheduling of operations, including greater amount of resources can cause many difficulties, depending on whether the resource is involved in the entire time of operation, only in the selected part(s) of operation (e.g. as auxiliary staff at setup time) or cyclic - e.g. when an operator supports more than one machine, or supervises the execution of several operations. For this reason the dates and work times of resources participation in the operation can be different. Presented issues are crucial when modelling of production scheduling environment and designing of structures for the purpose of scheduling software development.Keywords
This publication has 12 references indexed in Scilit:
- Interaction of the Decision Maker in the Process of Production SchedulingAdvanced Materials Research, 2014
- Agent-Based Systems Approach for Robotic Workcell IntegrationAdvanced Materials Research, 2014
- Computer Aided Analysis of Systems with MFC ActuatorsAdvanced Materials Research, 2014
- The Methodology of Development of the Manufacturing Information Acquisition System (MIAS) for Production ManagementApplied Mechanics and Materials, 2014
- The Model of Discrete Production Scheduling System in UML Notation - Classes DiagramsAdvanced Materials Research, 2013
- Parallel machine scheduling with additional resources: Notation, classification, models and solution methodsEuropean Journal of Operational Research, 2013
- Personnel scheduling: A literature reviewEuropean Journal of Operational Research, 2013
- Active Synthesis of Discrete Systems as a Tool for Stabilisation VibrationApplied Mechanics and Materials, 2013
- Dynamical Flexibility of Complex Damped Systems Vibrating Transversally in TransportationSolid State Phenomena, 2010
- An integrated survey of deterministic project schedulingOmega, 2001