Contested overruns and performance of offshore wind power plants
- 8 August 2012
- journal article
- research article
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 30 (8) , 609-622
Abstract
Offshore wind power plants are expected to expand rapidly in the coming years. These large engineering construction projects are important for climate change mitigation. The paper contributes to socio-technical understanding of engineering construction. Cost, time, delays and performance results of selected British plants are investigated, with a focus on strategic misrepresentation. This megaproject concept is combined with a socio-technical content analysis of offshore wind farms and provides a technologically precise and contemporary conceptualization in comparison with complex engineering and megaproject approaches. Based on publicly available data, budget and time overruns and underperformance are demonstrated. Budget overruns range from 0% to 65%; time overruns from 9% to 100%, Operational performance indicators reveal plants far below and just below estimations. These are all indications of strategic misrepresentation, but according to project players, the delays originate from weather, product technology, site features and processes. The findings thus indicate a latent controversy regarding reasons for overruns. A socio-technical variant of reference class forecasting (RCF) is developed to explore whether RCF could improve the estimates. Socio-technical RCF is developed for 10 plants that share foundation, national and geotechnical conditions. This provides an illustrative example of a proposed uplift for London Array. Such an RCF should be orchestrated with more governance mechanisms in order to improve future investments in engineering construction, including offshore plants.Keywords
This publication has 25 references indexed in Scilit:
- Pricing offshore wind powerEnergy Policy, 2011
- Early experiences with UK round 1 offshore wind farmsProceedings of the Institution of Civil Engineers - Energy, 2010
- The accuracy of risk‐based cost estimation for water infrastructure projects: preliminary evidence from Australian projectsConstruction Management and Economics, 2010
- A comparison of offshore wind power development in europe and the U.S.: Patterns and drivers of developmentApplied Energy, 2009
- Survival of the unfittest: why the worst infrastructure gets built--and what we can do about itOxford Review of Economic Policy, 2009
- The key technology of offshore wind farm and its new development in ChinaRenewable and Sustainable Energy Reviews, 2009
- Curbing Optimism Bias and Strategic Misrepresentation in Planning: Reference Class Forecasting in PracticeEuropean Planning Studies, 2007
- Underestimating Costs in Public Works Projects:Error or Lie?Journal of the American Planning Association, 2002
- Factors influencing construction time and cost overruns on high-rise projects in IndonesiaConstruction Management and Economics, 1997
- Prospect Theory: An Analysis of Decision under RiskEconometrica, 1979