ESTIMATING NORMAL DURATION OF RENOVATION FOR MULTISTORY APARTMENT BUILDING CONSIDERING EXTENSION-TYPE RENOVATION PROJECTS
Open Access
- 8 February 2019
- journal article
- research article
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 25 (2) , 156-167
Abstract
Normal (typical) project duration is estimated at the initial stage of a renovation project and is an important reference for project control. However, its estimation has not been researched extensively owing to the complexity and uncertainties of renovation. Thus, a model was developed for predicting the duration of sustainable apartment renovation. Experts were asked to estimate a baseline schedule for extension-type renovation projects, factors that influence critical path activities, and the range of project durations considering these factors. An equation for estimating the duration of a renovation project was developed, and the range of project durations was derived using a MCS to reflect uncertainty. The proposed model was validated by applying it to actual cases. The case study shows that the model would be more suitable for complex renovation construction (i.e., more than two buildings or vertical extension). The model can be applied to various renovation projects and used as a reference for determining contract time. It can fill the knowledge gap of construction duration forecasting by adapting the concept of control activities to simplify the assessment of uncertainties in renovation of apartments, and can be applied for forecasting sustainable renovation time for other project types or in other locations.Keywords
This publication has 36 references indexed in Scilit:
- Unveiling the Process of Sustainable RenovationSustainability, 2012
- Case Study on Selective Demolition Method for Refurbishing Deteriorated Residential ApartmentsJournal of Construction Engineering and Management, 2012
- Energy renovation of single-family houses in Denmark utilising long-term financing based on equityApplied Energy, 2011
- Planning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract typeInternational Journal of Project Management, 2011
- A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projectsCanadian Journal of Civil Engineering, 2010
- A hybrid decision support system for sustainable office building renovation and energy performance improvementEnergy and Buildings, 2010
- Project scheduling under uncertainty: Survey and research potentialsEuropean Journal of Operational Research, 2005
- Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoningBuilding and Environment, 2004
- The assessment of risk in conservation refurbishment projectsStructural Survey, 2001
- Simulation Model to Forecast Project Completion TimeJournal of Construction Engineering and Management, 1985