An efficient genetic programming approach to design priority rules for resource-constrained project scheduling problem
Authors:
- Jingyu LuoJLJingyu Luo
- Mario VanhouckeMVMario Vanhoucke
- José CoelhoJCJosé Coelho
- Weikang GuoWGWeikang Guo
- 9 March 2022
- journal article
- research article
- Published by Elsevier in Expert Systems with Applications
- Vol. 198
Abstract
No abstract availableKeywords
Funding Information
- China Scholarship Council (201708210261)
This publication has 41 references indexed in Scilit:
- An evaluation of the adequacy of project network generators with systematically sampled networksEuropean Journal of Operational Research, 2008
- Automated Discovery of Local Search Heuristics for Satisfiability TestingEvolutionary Computation, 2008
- Phase transitions in project schedulingJournal of the Operational Research Society, 1999
- Resource-constrained project scheduling: Notation, classification, models, and methodsEuropean Journal of Operational Research, 1999
- PSPLIB - A project scheduling problem libraryEuropean Journal of Operational Research, 1997
- An investigation into the relationship of heuristic performance with network-resource characteristicsJournal of the Operational Research Society, 1997
- Efficient priority rules for the resource‐constrained project scheduling problemJournal of Operations Management, 1996
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computationEuropean Journal of Operational Research, 1996
- Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project SchedulingJournal of the Operational Research Society, 1989
- Project scheduling: The effects of problem structure on heuristic performanceNaval Research Logistics Quarterly, 1976