Dispatching Rules for Scheduling Twin Automated Gantry Cranes in an Automated Railroad Container Terminal
Authors:
- 26 September 2019
- journal article
- research article
- Published by Springer Nature in Arabian Journal for Science and Engineering
- Vol. 45 (3) , 2205-2217
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (51405403)
- Fundamental Research Funds for the Central Universities (2682018CX09)
- Postdoctoral Research Foundation of China (2015M582566)
This publication has 45 references indexed in Scilit:
- Modeling and solving rich quay crane scheduling problemsComputers & Operations Research, 2012
- Determining fixed crane areas in rail–rail transshipment yardsTransportation Research Part E: Logistics and Transportation Review, 2010
- Determining crane areas in intermodal transshipment yards: The yard partition problemEuropean Journal of Operational Research, 2010
- A survey of berth allocation and quay crane scheduling problems in container terminalsEuropean Journal of Operational Research, 2010
- Real-time scheduling for twin RMGs in an automated container yardOR Spectrum, 2010
- A fast heuristic for quay crane scheduling with interference constraintsJournal of Scheduling, 2009
- AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEMAsia-Pacific Journal of Operational Research, 2009
- A tabu search heuristic for the quay crane scheduling problemJournal of Scheduling, 2007
- A branch‐and‐cut algorithm for the quay crane scheduling problem in a container terminalNaval Research Logistics (NRL), 2005
- A crane scheduling method for port container terminalsEuropean Journal of Operational Research, 2004