Abstract
Electricity cost constitutes an important part of the total energy cost for some energy-intensive industries (EIIs). For enterprises belonging to such EIIs, an effective way to reduce the electricity cost is to integrate the renewable energy such as wind and/or photovoltaic energy into their energy systems. In this paper, the problem of generation scheduling of self-generation power plant (SGPP) in EII microgrid with wind power is considered. Firstly, a robust optimization-based formulation with flexible uncertainty set is established to obtain the feasible range of SGPP outputs, which can ensure the robustness and nonanticipativity of the system. Secondly, the economic dispatch (ED) model based on the feasible range is proposed and the multi-period scheduling problem is decoupled into a series of single-period ED problems. Besides, the analytical solution to the ED problem is given and thus the computational efficiency is guaranteed. Numerical testing is performed for a real system and the results show that the method is effective.Keywords
Funding Information
- National Key Research and Development Program of China Stem Cell and Translational Research (2016YFB0901900)
- National Natural Science Foundation of China (61773309, 61773308, U1766205)
- State Key Laboratory of Operation and Control of Renewable Energy & Storage Systems
This publication has 35 references indexed in Scilit:
- Experimental Demonstration of a Tiered Power Management System for Economic Operation of Grid-Tied MicrogridsIEEE Transactions on Sustainable Energy, 2014
- Microgrid Optimal Scheduling With Multi-Period Islanding ConstraintsIEEE Transactions on Power Systems, 2013
- Stochastic Energy Scheduling in Microgrids With Intermittent Renewable Energy ResourcesIEEE Transactions on Smart Grid, 2013
- A Chance-Constrained Unit Commitment With an $n-K$ Security Criterion and Significant Wind GenerationIEEE Transactions on Power Systems, 2012
- An efficient scenario-based stochastic programming framework for multi-objective optimal micro-grid operationApplied Energy, 2012
- Load commitment in a smart homeApplied Energy, 2012
- Stochastic Programming: Nonanticipativity and Lagrange Multipliers2008
- Optimal operation of industrial cogeneration for load managementIEEE Transactions on Power Systems, 2003
- Unit commitment with identical units successive subproblem solving method based on Lagrangian relaxationIEEE Transactions on Power Systems, 2002
- Nonanticipativity and L 1-martingales in stochastic optimization problems1976