External-Cost Estimation of Electricity Generation in G20 Countries: Case Study Using a Global Life-Cycle Impact-Assessment Method
Open Access
- 5 March 2020
- journal article
- research article
- Published by MDPI AG in Sustainability
- Vol. 12 (5) , 2002
Abstract
The external costs derived from the environmental impacts of electricity generation can be significant and should not be underrated, as their consideration can be useful to establish a ranking between different electricity generation sources to inform decision-makers. The aim of this research is to transparently evaluate the recent external cost of electricity generation in G20 countries using a global life-cycle impact-assessment (LCIA) method: life cycle impact assessment method based on endpoint modeling (LIME3). The weighting factors developed in the LIME3 method for each G20 country enable one to convert the different environmental impacts (not only climate change and air pollution) resulting from the emissions and resources consumption during the full lifecycle of electricity generation—from resource extraction to electricity generation—into a monetary value. Moreover, in LIME3, not only the weighting factors are developed for each G20 country but also all the impact categories. Using this method, it was possible to determine accurately which resources or emission had an environmental impact in each country. This study shows that the countries relying heavily on coal, such as India (0.172 $/kWh) or Indonesia (0.135 $/kWh) have the highest external costs inside the G20, with air pollution and climate accounting together for more than 80% of the costs. In these two countries, the ratio of the external cost/market price was the highest in the G20, at 2.3 and 1.7, respectively. On the other hand, countries with a higher reliance on renewable energies, such as Canada (0.008 $/kWh) or Brazil (0.012 $/kWh) have lower induced costs. When comparing with the market price, it has to be noted also that for instance Canada is able to generate cheap electricity with a low-external cost. For most of the other G20 countries, this cost was estimated at between about 0.020$ and 0.040 $/kWh. By estimating the external cost of each electricity generation technology available in each G20 country, this study also highlighted that sometimes the external cost of the electricity generated from one specific technology can be significant even when using renewables due to resource scarcity—for example, the 0.068 $/kWh of electricity generated from hydropower in India. This information, missing from most previous studies, should not be omitted by decision makers when considering which type of electricity generation source to prioritize.
Keywords
This publication has 64 references indexed in Scilit:
- External cost of coal based electricity generation: A tale of Ahmedabad cityEnergy Policy, 2012
- Dispersion of pollutants, environmental externalities due to a pulverized coal power plant and their effect on the cost of electricityEnergy, 2012
- External costs from coal-fired thermal plants and sulphur dioxide emission limit values for new plants in Bosnia and HerzegovinaEnergy Policy, 2011
- Impact of a possible environmental externalities internalisation on energy prices: The case of the greenhouse gases from the Greek electricity sectorEnergy Economics, 2010
- Assessment of the impacts on health due to the emissions of Cuban power plants that use fossil fuel oils with high content of sulfur. Estimation of external costsAtmospheric Environment, 2007
- Internalizing externalities of electricity generation: An analysis with MESSAGE-MACROEnergy Policy, 2007
- Internalisation of external cost in the power generation sector: Analysis with Global Multi-regional MARKAL modelEnergy Policy, 2007
- External costs of electricity production: case study CroatiaEnergy Policy, 2004
- Electricity and externalities in South AfricaEnergy Policy, 2003
- Human health damages due to ionising radiation in life cycle impact assessmentEnvironmental Impact Assessment Review, 2000