Abstract
This paper presents a two-layered framework for managing multi-interval economic dispatch with both transmission and ramping constraints in electric energy systems with a large penetration of variable resources. The proposed model is aimed at ensuring that there is sufficient flexibility in the dispatch to manage large net load ramp events while observing the transmission constraints in the power network. A flexibility metric termed lack of ramp probability (LORP) is used to quantify the ramp capability. This metric is shown to be applicable in system-wide and decomposed zonal settings. A two-layered robust optimization-based dispatch is then formulated as an approach to ensuring a level of LORP flexibility with transmission constraints in large power networks. This two-layered approach is shown to be rigorous in terms of guaranteeing flexibility and is implementable for real-time dispatch in multi-zonal energy systems. The performance of the proposed dispatch framework is illustrated in a modified IEEE 24-bus Reliability Test System.Keywords
This publication has 9 references indexed in Scilit:
- Robust Optimization Based Economic Dispatch for Managing System Ramp Requirement2014
- A two-stage robust optimization for PJM look-ahead unit commitment2013
- Early Detection and Optimal Corrective Measures of Power System Insecurity in Enhanced Look-Ahead DispatchIEEE Transactions on Power Systems, 2012
- Reserve zone determination based on statistical clustering methods2012
- Adaptive Robust Optimization for the Security Constrained Unit Commitment ProblemIEEE Transactions on Power Systems, 2012
- An improved bus aggregation technique for generating network equivalents2012
- Robust Unit Commitment With Wind Power and Pumped Storage HydroIEEE Transactions on Power Systems, 2011
- Look-ahead dispatch in ERCOT: Case study2011
- Robust Optimization2009