An extended MULTIMOORA method based on OWGA operator and Choquet integral for risk prioritization identification of failure modes
- 1 May 2020
- journal article
- research article
- Published by Elsevier in Engineering Applications of Artificial Intelligence
- Vol. 91
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation, China (51835001, 51705048)
- National Major Scientific and Technological Special Project for “High-grade CNC and Basic Manufacturing Equipment”, China (2018ZX04032-001, 2019ZX04005-001)
This publication has 59 references indexed in Scilit:
- An analytic approach to obtain the least square deviation OWA operator weightsFuzzy Sets and Systems, 2014
- Applying the concept of exponential approach to enhance the assessment capability of FMEAJournal of Intelligent Manufacturing, 2013
- A rough TOPSIS Approach for Failure Mode and Effects Analysis in Uncertain EnvironmentsQuality and Reliability Engineering International, 2013
- MULTIMOORA OPTIMIZATION USED TO DECIDE ON A BANK LOAN TO BUY PROPERTYTechnological and Economic Development of Economy, 2011
- PROJECT MANAGEMENT BY MULTIMOORA AS AN INSTRUMENT FOR TRANSITION ECONOMIES / PROJEKTŲ VADYBA SU MULTIMOORA KAIP PRIEMONĖ PEREINAMOJO LAIKOTARPIO ŪKIAMSTechnological and Economic Development of Economy, 2010
- Two new models for determining OWA operator weightsComputers & Industrial Engineering, 2007
- An overview of methods for determining OWA weightsInternational Journal of Intelligent Systems, 2005
- A study of the origin and uses of the ordered weighted geometric operator in multicriteria decision makingInternational Journal of Intelligent Systems, 2003
- Some quantities represented by the Choquet integralFuzzy Sets and Systems, 1993
- On ordered weighted averaging aggregation operators in multicriteria decisionmakingIEEE Transactions on Systems, Man, and Cybernetics, 1988