An effective powerful test for one-sided supplier selection problem
Authors:
- 24 January 2011
- journal article
- research article
- Published by Taylor & Francis in Journal of Statistical Computation and Simulation
- Vol. 81 (10) , 1313-1331
Abstract
In this paper, we consider the supplier selection problem, which deals with comparing two one-sided processes and selecting a better one that has a higher capability. We first review two existing approximation approaches, and an exact approach proposed which we refer to as the division method. We then develop a new exact approach called the subtraction method. We compare the two exact methods on the selection power. The results show that the proposed subtraction method is indeed more powerful than the division method. A two-phase selecting procedure is then developed based on the subtraction method for practical applications. Some computational results are tabulated for practitioners’ convenience.Keywords
This publication has 29 references indexed in Scilit:
- Tool replacement policy for one-sided processes with low fraction defectiveJournal of the Operational Research Society, 2007
- Tool replacement for production with a low fraction of defectivesInternational Journal of Production Research, 2006
- Variables sampling plans with PPM fraction of defectives and process loss considerationJournal of the Operational Research Society, 2006
- Critical acceptance values and sample sizes of a variables sampling plan for very low fraction of defectivesOmega, 2006
- Empirical analysis of supplier selection and involvement, customer satisfaction, and firm performanceSupply Chain Management: An International Journal, 2001
- A CAPABILITY INDEX FOR MULTIPLE PROCESS STREAMSQuality Engineering, 1999
- An empirical investigation of supplier development: reactive and strategic processesJournal of Operations Management, 1998
- AN IMPLEMENTATION OF THE PRECISION INDEX FOR CONTAMINATED PROCESSESQuality Engineering, 1998
- MULTIPROCESS PERFORMANCE ANALYSIS: A CASE STUDYQuality Engineering, 1997
- SELECTING A BETTER SUPPLIER BY TESTING PROCESS CAPABILITY INDICESQuality Engineering, 1994