Machine Downtime Effect on the Warm-Up Period in an Economic Production Quantity Problem
Authors:
- Erfan NobilENErfan Nobil
- Leopoldo Eduardo Cárdenas-BarrónLeopoldo Eduardo Cárdenas-Barrón
- Dagoberto Garza-NúñezDGDagoberto Garza-Núñez
- Gerardo Treviño-GarzaGTGerardo Treviño-Garza
- Armando Céspedes-MotaACArmando Céspedes-Mota
- Imelda de Jesús Loera-HernándezILImelda de Jesús Loera-Hernández
- Neale R. SmithNSNeale R. Smith
- Amir Hossein NobilANAmir Hossein Nobil
Open Access
- 5 April 2023
- journal article
- research article
- Published by MDPI AG in Mathematics
- Vol. 11 (7) , 1740
Abstract
Success in the industrial sector is compromised by diverse conditions such as imperfect product production, manufacturing line interruptions, and unscheduled maintenance. The precise use of common practices in production environments is an available solution to eliminate some of these issues. Applying a warm-up period in a manufacturing process is adequate and cost-effective for almost all companies. It improves the equipment’s productivity and helps the manufacturing line generate fewer defective products. Even though several inventory management studies have included a warm-up phase in their models, its use in economic production quantity (EPQ) models remains largely unexplored. Adding a warm-up phase to the production cycle minimizes maintenance expenses and defective products and increases the machine’s performance. In this study, the dependency between the machine downtime and the warm-up length is examined for the first time. The warm-up time depends on the machine’s off-state period: if the machine has a longer operation timeout, then a longer warm-up period is needed. The model includes a function to model the warm-up time relative to the machine downtime and two types of defective products: scrapping and reworking items. The study is concluded with some numerical examples, a sensitivity analysis, and some management insights related to the EPQ.Keywords
This publication has 35 references indexed in Scilit:
- Economic production quantity in an imperfect manufacturing process with synchronous and asynchronous flexible rework ratesOperations Research Perspectives, 2019
- Multi-item sustainable green production system under trade-credit and partial backorderingJournal of Cleaner Production, 2018
- Economic production quantity model considering warm-up period in a cleaner production environmentInternational Journal of Production Research, 2018
- Green supply chain with learning in production and environmental investmentsIFAC-PapersOnLine, 2018
- Optimization of machine downtime in the plastic manufacturingCogent Engineering, 2017
- Energy Efficient Control Strategy for Machine Tools with Stochastic Arrivals and Time Dependent Warm-upProcedia CIRP, 2014
- Machine control policies for energy saving in manufacturing2013
- Energy Reduction in a Pallet-Constrained Flow Shop Through On–Off Control of Idle MachinesIEEE Transactions on Automation Science and Engineering, 2012
- Energy-Efficient Production Systems Through Schedule-Based OperationsIEEE Transactions on Automation Science and Engineering, 2012
- Operational methods for minimization of energy consumption of manufacturing equipmentInternational Journal of Production Research, 2007