Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem
Authors:
- 7 June 2008
- journal article
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 20 (4) , 389-400
Abstract
No abstract availableKeywords
This publication has 20 references indexed in Scilit:
- Multi-objective Supply Chain Optimization: An Industrial Case Study2007
- On-line maintenance job scheduling and assignment to resources in distributed systems by heuristic-based optimizationJournal of Intelligent Manufacturing, 2004
- Heuristics for scheduling maintenance and production on a single machine2003
- On metrics for comparing nondominated sets2003
- Minimizing Job Tardiness Using Integrated Preventive Maintenance Planning and Production SchedulingIIE Transactions, 2003
- A Real-World Test Problem for EMO AlgorithmsLecture Notes in Computer Science, 2003
- The Measure of Pareto Optima Applications to Multi-objective Metaheuristics2003
- Balance between genetic search and local search in memetic algorithms for multiobjective permutation flowshop schedulingIEEE Transactions on Evolutionary Computation, 2003
- Scheduling jobs and maintenance activities on parallel machinesNaval Research Logistics (NRL), 2000
- A Fast Elitist Non-dominated Sorting Genetic Algorithm for Multi-objective Optimization: NSGA-II2000