Forecasting in large cointegrated processes
Authors:
- 19 May 2009
- journal article
- research article
- Published by Wiley in Journal of Forecasting
- Vol. 28 (7) , 631-650
Abstract
It is widely recognized that taking cointegration relationships into consideration is useful in forecasting cointegrated processes. However, there are a few practical problems when forecasting large cointegrated processes using the well‐known vector error correction model. First, it is hard to identify the cointegration rank in large models. Second, since the number of parameters to be estimated tends to be large relative to the sample size in large models, estimators will have large standard errors, and so will forecasts. The purpose of the present paper is to propose a new procedure for forecasting large cointegrated processes which is free from the above problems. In our Monte Carlo experiment, we find that our forecast gains accuracy when we work with a larger model as long as the ratio of the cointegration rank to the number of variables in the process is high. Copyright © 2009 John Wiley & Sons, Ltd.Keywords
All Related Versions
This publication has 20 references indexed in Scilit:
- A test of cointegration rank based on principal component analysisApplied Economics Letters, 2008
- A PANIC Attack on Unit Roots and CointegrationEconometrica, 2004
- Principal Components Analysis of Cointegrated Time SeriesEconometric Theory, 1997
- Likelihood-Based Inference in Cointegrated Vector Autoregressive Models1995
- Forecasting in cointegrated systemsJournal of Applied Econometrics, 1995
- COINTEGRATION AND COMMON FACTORSJournal of Time Series Analysis, 1994
- On the limitations of comparing mean square forecast errorsJournal of Forecasting, 1993
- Estimation and Hypothesis Testing of Cointegration Vectors in Gaussian Vector Autoregressive ModelsEconometrica, 1991
- Statistical analysis of cointegration vectorsJournal of Economic Dynamics and Control, 1988
- Forecasting and testing in co-integrated systemsJournal of Econometrics, 1987