Optimization of material requirement planning by fuzzy multi-objective linear programming
Authors:
- 1 July 2008
- journal article
- research article
- Published by SAGE Publications in Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture
- Vol. 222 (7) , 887-900
Abstract
Material requirement planning (MRP) has evolved from a simplistic representation in the 1980s to today's manufacturing resource planning (MRPII) and enterprise resource planning (ERP) systems in order to meet changing business demands. The persisting momentous drive for lowest costs and highest quality dictates that MRP is deployed in an optimal manner. Multi-objective linear programming (MOLP), which is used simultaneously to optimize decisions through trade-offs between two or more conflicting objectives, has not been reported in MRP-related literature. As an extension of work reported by Yenisey [1], where optimization of material flow in MRP had been presented, a fuzzy multi-objective linear programming (f-MOLP) model is used where two objectives, namely minimization of total cost and minimization of total time of MRP, are targeted. The objective is to find the optimum production rate for each end-product at each period in accordance with the objectives and related constraints. The proposed f-MOLP is solved for two sets of conditions consisting of symmetric and asymmetric cases. The corresponding results show that the proposed models can help manufacturers make better decisions when facing uncertainty about objective functions as well as the constraints set. Degrees of satisfaction demonstrate the applicability of the proposed approach in the context of MRP.Keywords
This publication has 34 references indexed in Scilit:
- The early road to material requirements planningJournal of Operations Management, 2006
- MRP with flexible constraints: A fuzzy mathematical programming approachFuzzy Sets and Systems, 2006
- A review of production planning and control: the applicability of key concepts to the make-to-order industryInternational Journal of Production Research, 2005
- Application of fuzzy multi-objective linear programming to aggregate production planningComputers & Industrial Engineering, 2004
- MRP in a job shop environment using a resource constrained project scheduling modelOmega, 2002
- An integrated MRP and JIT frameworkComputers & Industrial Engineering, 2001
- Introducing capacity limitations into multi-level, multi-stage production-inventory systems applying the input-output/Laplace transform approachInternational Journal of Production Research, 2000
- An interactive analytic center trade-off cutting plane algorithm for multiobjective linear programmingComputers & Industrial Engineering, 1999
- Anchoring Points and Cones of Opportunities in Interior Multiobjective Linear ProgrammingJournal of the Operational Research Society, 1994
- A New Framework for Manufacturing Planning and Control Systems*Decision Sciences, 1993