Efficiency and energy consumption of the automated container yard with twin rail-mounted gantry cranes considering crane scheduling strategies and handshake area designs
Authors:
- Guolei TangGuolei Tang
- Mengxin LiMLMengxin Li
- Zhuo FangZFZhuo Fang
- Chen ShenCSChen Shen
- Yue QiYQYue Qi
- Zhonghan ZhenZZZhonghan Zhen
- Zhuoyao ZhaoZZZhuoyao Zhao
- 19 June 2024
- journal article
- research article
- Published by Elsevier in Simulation Modelling Practice and Theory
- Vol. 135
Abstract
No abstract availableKeywords
Funding Information
- Fundamental Research Funds for the Central Universities (DUT18JC29)
- Ministry of Science and Technology of the People's Republic of China
- National Key Research and Development Program of China (2020YFE0201200)
This publication has 44 references indexed in Scilit:
- Twin-crane scheduling during seaside workload peaks with a dedicated handshake areaJournal of Scheduling, 2021
- Comparison and Optimization of Automated Yard Crane Systems at Container Terminals2020
- A decomposition-based approach to the scheduling of identical automated yard cranes at container terminalsJournal of Scheduling, 2019
- Scheduling crossover cranes at container terminals during seaside peak timesJournal of Heuristics, 2018
- Simulation modelling in ports and container terminals: literature overview and analysis by research field, application area and toolFlexible Services and Manufacturing Journal, 2016
- Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumptionAdvanced Engineering Informatics, 2015
- The integrated optimization of container terminal scheduling with uncertain factorsComputers & Industrial Engineering, 2014
- Real-time scheduling for twin RMGs in an automated container yardOR Spectrum, 2010
- Scheduling automated triple cross-over stacking cranes in a container yardOR Spectrum, 2010
- Operations research at container terminals: a literature updateOR Spectrum, 2007