Study on the mechanical mechanism and control optimization of station subsurface excavation by pile-beam-arch method
Authors:
Open Access
- 13 March 2025
- journal article
- research article
- Published by Springer Nature in Scientific Reports
- Vol. 15 (1) , 1-23
Abstract
This paper is based on the construction of the underground Pile-Beam-Arch station at Beitaipingzhuang Station of Beijing Metro Line 12. It employs finite element software for three-dimensional numerical modeling, faithfully reproducing the entire station construction process. The results indicate that the excavation of the pilot tunnel and the stage of the secondary lining buckle arch are the main causes of surface deformation. Additionally, the construction of the secondary lining buckle arch is the primary factor inducing deformation in the middle column and side pile. On this basis, the paper investigates the influence of four crucial factors: the stagger distance of the pilot tunnel excavation, the sequence of the secondary lining buckle arch, the excavation sequence of the lower soil, and the excavation depth on the stress and deformation characteristics of the stratum and the station structure. The results suggest that when the distance between adjacent pilot tunnel faces is 1.5 to 3 times the diameter of the pilot tunnel, it has the greatest influence on surface settlement. When the first side is followed by the middle, closely aligning the second lining with the initial support, and simultaneously installing buckle arches on both sides minimizes deformation of the stratum and station structure. During excavation of the lower soil in the station, reducing the single excavation depth and prioritizing excavation on both sides help control deformation of the vertical bearing structure. The optimal construction scheme is derived through multi-criteria optimization and implemented in the field. Field monitoring results are in good agreement with simulation outcomes, offering valuable reference for the construction of stations under similar geological conditions.Keywords
Funding Information
- Hebei University of Engineering Innovation Fund Project Funding (SJ2401002125)
- National Natural Science Foundation of China (52274148)
This publication has 15 references indexed in Scilit:
- A New Calculation Method for Tunneling-Caused Stratum SettlementKSCE Journal of Civil Engineering, 2022
- Ground surface settlement response to subway station construction activities using pile–beam–arch methodTunnelling and Underground Space Technology, 2021
- Formula for predicting ground settlement induced by tunnelling based on Gaussian functionTunnelling and Underground Space Technology, 2020
- Challenges and countermeasures for using pile-beam-arch approach to enlarge large-diameter shield tunnel to subway stationTunnelling and Underground Space Technology, 2020
- Surface settlement of subway station construction using pile-beam-arch approachTunnelling and Underground Space Technology, 2019
- Numerical study on the response of ground movements to construction activities of a metro station using the pile-beam-arch methodTunnelling and Underground Space Technology, 2019
- Numerical analysis on the mechanical performance of supporting structures and ground settlement characteristics in construction process of subway station built by Pile-Beam-Arch methodKSCE Journal of Civil Engineering, 2016
- Internal force calculation and supporting parameters sensitivity analysis of side piles in the subway station excavated by Pile-Beam-Arch methodTunnelling and Underground Space Technology, 2016
- Influence of deep excavation induced ground movements on adjacent pilesTunnelling and Underground Space Technology, 2016
- Environmental risk management for a cross interchange subway station construction in ChinaTunnelling and Underground Space Technology, 2011