A multiobjective genetic algorithm for job shop scheduling
Authors:
- S.G. PonnambalamSPS.G. Ponnambalam
- V. RamkumarVRV. Ramkumar
- N. JawaharNJN. Jawahar
- 1 January 2001
- journal article
- Published by Taylor & Francis in Production Planning & Control
- Vol. 12 (8) , 764-774
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- A genetic algorithm for scheduling flexible manufacturing systemsThe International Journal of Advanced Manufacturing Technology, 1998
- Multi-objective genetic algorithm and its applications to flowshop schedulingComputers & Industrial Engineering, 1996
- Scheduling in flowshop and cellular manufacturing systems with multiple objectives— a genetic algorithmic approachProduction Planning & Control, 1996
- Scheduling Algorithms1995
- Decentral Production Scheduling of Assembly Systems with Genetic AlgorithmCIRP Annals, 1994
- Genetic Algorithms + Data Structures = Evolution Programs1992
- A new heuristic for the n-job, M-machine flow-shop problemEuropean Journal of Operational Research, 1991
- Genetic algorithms and job shop schedulingComputers & Industrial Engineering, 1990
- A Review of Job Shop SchedulingJournal of the Operational Research Society, 1966
- Algorithms for Solving Production-Scheduling ProblemsOperations Research, 1960