Stochastic proportionate flowshop scheduling with setups
Authors:
- 27 April 2001
- journal article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 39 (3-4) , 357-369
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- A review of scheduling research involving setup considerationsOmega, 1999
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic BreakdownsJournal of the Operational Research Society, 1995
- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective functionEuropean Journal of Operational Research, 1995
- Two-machine ordered flowshop scheduling under random breakdownsMathematical and Computer Modelling, 1994
- Stochastic Single Machine Scheduling with Quadratic Early-Tardy PenaltiesOperations Research, 1993
- Single-machine scheduling subject to stochastic breakdownsNaval Research Logistics (NRL), 1990
- Kanban, MRP, and Shaping the Manufacturing EnvironmentManagement Science, 1987
- Focused Scheduling in Proportionate FlowshopsManagement Science, 1985
- The Influence of Setup Time on Job Shop PerformanceManagement Science, 1969
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954