A Model-Free Reinforcement Learning Approach Using Monte Carlo Method for Production Ramp-Up Policy Improvement - A Copy Exactly Test Case
Authors:
- Stefanos C. DoltsinisSDStefanos C. Doltsinis
- Niels LohseNLNiels Lohse
- 1 May 2012
- journal article
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 45 (6) , 1628-1634
Abstract
No abstract availableThis publication has 11 references indexed in Scilit:
- Optimization of simulated production process performance using machine learning2009
- Information enabling production ramp‐upJournal of Manufacturing Technology Management, 2009
- Investing in product development and production capabilities: The crucial linkage between time-to-market and ramp-up timeEuropean Journal of Operational Research, 2006
- Reinforcement learning approach to self-organization in a biological manufacturing system frameworkProceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 2004
- The Copy-Exactly Ramp-Up Strategy: Trading-Off Learning With Process ChangeIEEE Transactions on Engineering Management, 2004
- Distributed Reinforcement Learning Control for Batch Sequencing and Sizing in Just-In-Time Manufacturing SystemsApplied Intelligence, 2004
- Time-Based Competition in Multistage Manufacturing: Stream-of-Variation Analysis (SOVA) Methodology—ReviewInternational Journal of Flexible Manufacturing Systems, 2004
- Cycle time management during production ramp-upRobotics and Computer-Integrated Manufacturing, 2003
- Learning and process improvement during production ramp-upInternational Journal of Production Economics, 2001
- Machine Learning Approaches to ManufacturingCIRP Annals, 1996