A multi-objective scatter search for a bi-criteria no-wait flow shop scheduling problem
- 19 March 2008
- journal article
- research article
- Published by Taylor & Francis in Engineering Optimization
- Vol. 40 (4) , 331-346
Abstract
The flow shop problem as a typical manufacturing challenge has gained wide attention in academic fields. This article considers a bi-criteria no-wait flow shop scheduling problem (FSSP) in which weighted mean completion time and weighted mean tardiness are to be minimized simultaneously. Since a FSSP has been proved to be NP-hard in a strong sense, a new multi-objective scatter search (MOSS) is designed for finding the locally Pareto-optimal frontier of the problem. To prove the efficiency of the proposed algorithm, various test problems are solved and the reliability of the proposed algorithm, based on some comparison metrics, is compared with a distinguished multi-objective genetic algorithm (GA), i.e. SPEA-II. The computational results show that the proposed MOSS performs better than the above GA, especially for the large-sized problems.Keywords
This publication has 11 references indexed in Scilit:
- Some aspects of scatter search in the flow-shop problemEuropean Journal of Operational Research, 2006
- Some local search algorithms for no-wait flow-shop problem with makespan criterionComputers & Operations Research, 2005
- Solving multi-objective production scheduling problems using metaheuristicsEuropean Journal of Operational Research, 2005
- A TSP-GA multi-objective algorithm for flow-shop schedulingThe International Journal of Advanced Manufacturing Technology, 2004
- Minimizing the weighted number of tardy jobs on a two-machine flow shopComputers & Operations Research, 2003
- A fast and elitist multiobjective genetic algorithm: NSGA-IIIEEE Transactions on Evolutionary Computation, 2002
- Minimizing tardiness in a two-machine flow-shopComputers & Operations Research, 2002
- A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch sizeMathematical and Computer Modelling, 1999
- Multi-objective genetic algorithm and its applications to flowshop schedulingComputers & Industrial Engineering, 1996
- HEURISTICS FOR INTEGER PROGRAMMING USING SURROGATE CONSTRAINTSDecision Sciences, 1977