Minimising cycle time in multi-manned assembly line balancing problem with dependent task times
- 25 March 2026
- journal article
- research article
- Published by Springer Nature in Annals of Operations Research
- Vol. 360 (2-3) , 723-766
Abstract
No abstract availableKeywords
This publication has 33 references indexed in Scilit:
- Multi-manned assembly line balancing problem with stochastic processing timesFlexible Services and Manufacturing Journal, 2025
- Benders’ decomposition based exact solution method for multi-manned assembly line balancing problem with walking workersAnnals of Operations Research, 2022
- Multi-manned assembly line balancing with time and space constraints: A MILP model and memetic ant colony systemComputers & Industrial Engineering, 2020
- A new mixed-integer linear programming formulation and particle swarm optimization based hybrid heuristic for the problem of resource investment and balancing of the assembly line with multi-manned workstationsComputers & Industrial Engineering, 2019
- Assembly line balancing problems with multi-manned stations: a new mathematical formulation and Gantt based heuristic methodAnnals of Operations Research, 2016
- A mathematical model and ant colony algorithm for multi-manned assembly line balancing problemThe International Journal of Advanced Manufacturing Technology, 2010
- A team-oriented design methodology for mixed model assembly systemsComputers & Industrial Engineering, 2009
- Assembly line balancing and group working: A heuristic procedure for workers’ groups operating on the same product and workstationComputers & Operations Research, 2006
- Simple assembly line balancing?Heuristic approachesJournal of Heuristics, 1997
- Partitioning procedures for solving mixed-variables programming problemsNumerische Mathematik, 1962