The algorithm for duration acceleration of repetitive projects considering the learning effect
- 1 January 2018
- conference paper
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 1944, 020011
Abstract
No abstract availableKeywords
This publication has 13 references indexed in Scilit:
- A genetic algorithm-based method for scheduling repetitive construction projectsAutomation in Construction, 2009
- Linear versus Network Scheduling: A Critical Path ComparisonJournal of Construction Engineering and Management, 2007
- Single-machine and two-machine flowshop scheduling with general learning functionsEuropean Journal of Operational Research, 2007
- Optimal Planning and Scheduling for Repetitive Construction ProjectsJournal of Management in Engineering, 2006
- Correspondence of activity relationships and critical path between time-location diagrams and CPMOperational Research, 2004
- Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM)Journal of Construction Engineering and Management, 2001
- Understanding the effect of the learning–forgetting phenomenon to duration of projects constructionInternational Journal of Project Management, 2001
- Scheduling Projects with Repeating ActivitiesJournal of Construction Engineering and Management, 1998
- Statistical attributes of the power learning curve modelInternational Journal of Production Research, 1997
- Extensions to Linear Scheduling OptimizationJournal of Construction Engineering and Management, 1988