Development and Performance Evaluation of an Integrated Disc Cutter System for TBMs
Open Access
- 11 January 2021
- journal article
- research article
- Published by MDPI AG in Applied Sciences
- Vol. 11 (2) , 644
Abstract
Changing the cutter is an essential procedure in tunnel boring machine (TBM) operations. The danger and low efficiency of manually replacing the disc cutter has led engineering equipment designers to study technologies to automate the changing of cutters. The key step is to design a new integrated disc cutter (simplifying the replacement process) to facilitate robot operation. Until now, the design and research of new integrated disc cutter systems has mainly relied on inspiration. In this paper, a solution space of a certain configuration of an integrated disc cutter system based on topology theory was designed. The evaluation system for the solution space was constructed by the analytic hierarchy process (AHP), and the optimal scheme of the configuration was finally obtained. In addition, experiments and simulations show that the structural strength and anti-loosening performance of the new disc cutter system meet the engineering requirements. Application of topology theory and the new evaluation system provides useful theoretical analyses and guidance for the design of new cutter systems.Keywords
Funding Information
- National Key Research and Development Program of China (2018YFB1306701)
- National Natural Science Foundation of China (51875076)
- National Natural Science Foundation of China-Liaoning Joint Fund (U1708255)
This publication has 21 references indexed in Scilit:
- Multi-directional coupling dynamic characteristics analysis of TBM cutterhead system based on tunnelling field testJournal of Mechanical Science and Technology, 2015
- Collision avoidance, virtual guides and advanced supervisory control teleoperation techniques for high-tech construction: framework designAutomation in Construction, 2014
- A new model for TBM performance prediction in blocky rock conditionsTunnelling and Underground Space Technology, 2014
- Introduction of an empirical TBM cutter wear prediction model for pyroclastic and mafic igneous rocks; a case history of Karaj water conveyance tunnel, IranTunnelling and Underground Space Technology, 2014
- Urban Flood Vulnerability and Risk Mapping Using Integrated Multi-Parametric AHP and GIS: Methodological Overview and Case Study AssessmentWater, 2014
- Snake robotsIndustrial Robot: the international journal of robotics research and application, 2014
- Evaluation of reallocation criteria in land consolidation studies using the Analytic Hierarchy Process (AHP)Land Use Policy, 2013
- A case study on the methane explosion in the excavation chamber of an EPB-TBM and lessons learnt including some recent accidentsTunnelling and Underground Space Technology, 2011
- An investigation on the anti-loosening characteristics of threaded fasteners under vibratory conditionsMechanism and Machine Theory, 2010
- Delay Time Analysis in Microtunneling ProjectsJournal of Construction Engineering and Management, 2007