Proactive Algorithms for Job Shop Scheduling with Probabilistic Durations
Preprint
Abstract
Most classical scheduling formulations assume a fixed and known duration for each activity. In this paper, we weaken this assumption, requiring instead that each duration can be represented by an independent random variable with a known mean and variance. The best solutions are ones which have a high probability of achieving a good makespan. We first create a theoretical framework, formally showing how Monte Carlo simulation can be combined with deterministic scheduling algorithms to solve this problem. We propose an associated deterministic scheduling problem whose solution is proved, under certain conditions, to be a lower bound for the probabilistic problem. We then propose and investigate a number of techniques for solving such problems based on combinations of Monte Carlo simulation, solutions to the associated deterministic problem, and either constraint programming or tabu search. Our empirical results demonstrate that a combination of the use of the associated deterministic problem and Monte Carlo simulation results in algorithms that scale best both in terms of problem size and uncertainty. Further experiments point to the correlation between the quality of the deterministic solution and the quality of the probabilistic solution as a major factor responsible for this success.Keywords
All Related Versions
This publication has 15 references indexed in Scilit:
- Project scheduling under uncertainty: Survey and research potentialsEuropean Journal of Operational Research, 2005
- Solving VRPTWs with Constraint Programming Based Column GenerationAnnals of Operations Research, 2004
- Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new resultsArtificial Intelligence, 2003
- Probabilistic scheduling guarantees for fault-tolerant real-time systems2003
- A Computational Study on Bounding the Makespan Distribution in Stochastic Project NetworksAnnals of Operations Research, 2001
- Dynamic problem structure analysis as a basis for constraint-directed scheduling heuristicsArtificial Intelligence, 2000
- The job shop scheduling problem: Conventional and new solution techniquesEuropean Journal of Operational Research, 1996
- ROBUSTNESS MEASURES AND ROBUST SCHEDULING FOR JOB SHOPSIIE Transactions, 1994
- Computational complexity of PERT problemsNetworks, 1988
- Scheduling of project networksAnnals of Operations Research, 1985