Abstract
A set of jobs related by precedence constraints is to be executed in minimum time on two uniform processors, the faster one using f time units per job and the slower $s \geqslant f$ time units. When $s = f + 1$ the desired schedule can be characterized as HLA, “highest-level-first with abstentions.” It can be found in linear time when there is no idle time; in general the time is exponential in the number of levels of the precedence graph. The problem of scheduling jobs related by precedence constraints on a length two pipeline processor is isomorphic to a simple version of the uniform processor problem. The optimum schedule is HLF, “highest-level-first,” and can be found in linear time. Approximately optimum schedules for two uniform processors can be found in linear or nearly linear time. The schedule that is optimum for two identical processors has accuracy at most a factor $2 - ({f / s})$ above optimum, for arbitrary f and s. The HLF schedule has accuracy ${5 / 4}$ for ${f / s} = {1 / 2}$ and ${6 / 5}$ for ${f / s} = {2 / 3}$.

This publication has 15 references indexed in Scilit: