Mathematical modeling using batch scheduling approach for optimal tritium inventory in the ISS of the ITER fuel cycle
Authors:
- Suh-Young LeeSLSuh-Young Lee
- Jae-Uk LeeJLJae-Uk Lee
- Min Ho ChangMCMin Ho Chang
- Jin-Kuk HaJHJin-Kuk Ha
- In-Beum LeeILIn-Beum Lee
- Min-Kyung LeeMLMin-Kyung Lee
- Euy Soo LeeELEuy Soo Lee
- 1 September 2021
- journal article
- research article
- Published by Elsevier in Fusion Engineering and Design
- Vol. 170
Abstract
No abstract availableKeywords
This publication has 15 references indexed in Scilit:
- Alternative analysis for fuel storage and delivery in the ITER Tritium PlantFusion Engineering and Design, 2014
- The ITER divertor pumping system, design evolution, simplification and performanceFusion Engineering and Design, 2013
- Recent analysis of key plasma wall interactions issues for ITERJournal of Nuclear Materials, 2009
- Modeled Tritium Inventories Within the ITER Fuel Cycle Systems in Typical Fueling ScenariosFusion Science and Technology, 2007
- The ITER tritium systemsFusion Engineering and Design, 2007
- Minimisation of the Hydrogenic Inventory of the ITER Neutral Beamline and Torus Cryo-Sorption PumpsFusion Science and Technology, 2005
- CFTSIM-ITER dynamic fuel cycle modelFusion Engineering and Design, 1998
- Steady State and Dynamic Simulation of the ITER Hydrogen Isotope Separation SystemFusion Technology, 1995
- Time-dependent tritium inventories and flow rates in fuel cycle components of a tokamak fusion reactorFusion Engineering and Design, 1995
- A general algorithm for short-term scheduling of batch operations—I. MILP formulationComputers & Chemical Engineering, 1993