Comparison of Four Time Series Forecasting Methods for Coal Material Supplies: Case Study of a Power Plant in Indonesia
Authors:
- 4 July 2021
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Abstract
Coal is the main fuel in the production process at PT PJB UBJ O&M Tenayan. As a raw material, coal needs to be considered in terms of supply to prevent losses (depreciation in caloric content) in case of oversupply. This study aimed to compare four forecasting methods for coal material supply. The four methods of time series forecasting are the moving average method, the weighted moving average, the single exponential smoothing, and the linear regression. Forecasting error calculations used the smallest MAD, MSE, and MAPE error parameters, whereas the tracking signal was used to monitor the forecasting results. The data required were coal supply and demand. Based on the data processing obtained, results of this study show that the best method is linear regression with the results of the MAD value of 13,285.63, MSE of 228,778,800, and MAPE of 15.04%. Based on the results of the tracking signal, the forecasting results were within the control limits, which shows that the linear regression method is the best forecasting method that can be applied to control coal supply in the next period.Keywords
This publication has 3 references indexed in Scilit:
- Study of Coal Inventory Planning Analysis in a Coal-Fired Power Plant Using Continuous and Periodic Review2019
- A Comparison of ARIMA and LSTM in Forecasting Time Series2018
- ANALISIS PERAMALAN PERMINTAAN PRODUK NATA DE COCO UNTUK MENDUKUNG PERENCANAAN DAN PENGENDALIAN PRODUKSI DALAM SUPPLY CHAIN DENGAN MODEL CPFR (COLLABORATIVE PLANNING, FORECASTING, AND REPLENISHMENT)JURNAL NUSANTARA APLIKASI MANAJEMEN BISNIS, 2017