Holistic Performance Evaluation of Highway Design-Build Projects
- 1 July 2020
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 36 (4)
Abstract
Many state transportation agencies (STAs) have adopted alternative contracting methods, including design-build (DB) contracting, to accelerate construction. Although DB has become increasingly common in recent years, very little definitive information is available about its performance with regards to key project performance indicators for highway rehabilitation projects. The lack of holistic quantitative performance assessments may result in STAs being misled when attempting to determine the best procurement methods and techniques for significant projects. This study fills this knowledge gap by using a rich dataset to evaluate the performance of DB contracting. A series of quantitative analyses were conducted to assess the likely effects of DB contracts on key project performance measures such as schedule, cost, and change orders. The results reveal that DB facilitates on-time project completion and results in fewer contract change orders during construction. No strong evidence, which indicates that DB contracts lead to greater cost increases over the traditional method, was found. These findings provide historical data-driven performance results for DB contracting that STAs can reference when evaluating competing contracting methods and techniques for high-impact projects.Keywords
This publication has 40 references indexed in Scilit:
- Guidelines for Administrating and Drafting Nonpayment Owners' Obligation Provisions under Design-Build ContractsJournal of Management in Engineering, 2019
- Examination of Project Duration, Project Intensity, and Timing of Cost Certainty in Highway Project Delivery MethodsJournal of Management in Engineering, 2019
- Time-Cost Performance Effect of Change Orders from Accelerated Contract ProvisionsJournal of Construction Engineering and Management, 2016
- Schedule Effectiveness of Alternative Contracting Strategies for Transportation Infrastructure Improvement ProjectsJournal of Construction Engineering and Management, 2012
- Decision support model for incentives/disincentives time–cost tradeoffAutomation in Construction, 2012
- Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction ContractsJournal of Construction Engineering and Management, 2010
- Frequency of Change Orders in Highway Construction Using Alternate Count-Data Modeling MethodsJournal of Construction Engineering and Management, 2010
- Hybrid ANN-CBR model for disputed change orders in construction projectsAutomation in Construction, 2007
- Causes of delay in large construction projectsInternational Journal of Project Management, 2006
- Cost Impacts, Scheduling Impacts, and the Claims Process during ConstructionJournal of Construction Engineering and Management, 2005