Basel Iii and Solvency Ii: Are the Risk Margins for Investments in Pv and Wind Adequate?
- 1 February 2013
- journal article
- Published by SAGE Publications in Energy & Environment
- Vol. 24 (1-2) , 171-194
Abstract
Worldwide investments in renewable energy (RE) have doubled between 2007 and 2011 while the financial crisis has led to stricter regulations. The paper describes the impacts of risk provision requirements on financing costs of RE investments. The risk assessment indicates that under the given conditions in Germany, policy and market risks are considered to be zero. Technical, performance and other risks are to be around 1.6 to 2.1 % p.a. So therefore, yield risk is left as the only determining default risk of RE investments. The risk provisions of RE investments are compared to the RE default risks by applying a simple cash-flow model. The findings show that risk provisions are not adequate for default risks and increase financing costs, and hence investment costs, in German PV and onshore wind generation plant, by up to EUR 13 million for large PV plants and EUR 8 million for wind parks (2011).Keywords
This publication has 15 references indexed in Scilit:
- Perception of risks in renewable energy projects: The case of concentrated solar power in North AfricaEnergy Policy, 2012
- Introduction to the special issue on project financeReview of Financial Economics, 2010
- Photovoltaik Engineering2010
- Finanzierung von Erneuerbare-Energien-Vorhaben2009
- Support systems for the diffusion of renewable energy technologies—an investor perspectiveEnergy Policy, 2006
- Effectiveness through risk reduction: a comparison of the renewable obligation in England and Wales and the feed-in system in GermanyEnergy Policy, 2006
- Financing renewable energy projects via closed-end funds—a German case studyRenewable Energy, 2003
- Financing investments in renewable energy : the impacts of policy designRenewable and Sustainable Energy Reviews, 1998
- Financing investments in renewable energy: The role of policy design and restructuring1997
- Comparison of financing costs for wind turbine and fossil powerplants1995